Inner working platform for rapid construction of bridge pier and construction method using inner working platform

The invention provides an inner working platform for rapid construction of a bridge pier and a construction method using the inner working platform. The inner working platform comprises at least one unit module which is overlapped vertically, wherein each unit module comprises a steel structure fram...

Full description

Saved in:
Bibliographic Details
Main Authors JU ZHIAN, XIAO WEI, LIAO SHIQIANG, MO HONGWU, HUANG XIAOMIAO, WANG SHENGUANG, FENG GUOYAO, BI LILI
Format Patent
LanguageEnglish
Published 11.03.2015
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides an inner working platform for rapid construction of a bridge pier and a construction method using the inner working platform. The inner working platform comprises at least one unit module which is overlapped vertically, wherein each unit module comprises a steel structure framework, a fixed platform, movable frameworks, a movable platform, stairs and protection guardrails, wherein each steel structure framework is formed by welding structural steel; the steel structure framework of each unit module is of a two-layered structure; fixing holes are correspondingly formed in the top and the bottom of each steel structure framework; the steel structure frameworks of two layers of adjacent overlapped unit modules penetrate through the fixing holes to be connected by plugs or bolts; each fixed platform is flatly laid above each layer of structure of the corresponding steel structure framework; the movable frameworks are movably connected with the two sides of the corresponding steel structure framework by plugs; each to two sides of each layer of structure is movably connected with one movable framework; the movable platforms are flatly laid on the movable frameworks; the stairs are connected between the two layers of structures of the steel structure frameworks; the protection guardrails are arranged at the peripheries of the stairs. With the adoption of the inner working platform, the construction efficiency and the construction quality can be effectively improved.
Bibliography:Application Number: CN201410668270