Inner working platform for rapid construction of bridge pier and construction method using inner working platform
The invention provides an inner working platform for rapid construction of a bridge pier and a construction method using the inner working platform. The inner working platform comprises at least one unit module which is overlapped vertically, wherein each unit module comprises a steel structure fram...
Saved in:
Main Authors | , , , , , , , |
---|---|
Format | Patent |
Language | English |
Published |
11.03.2015
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides an inner working platform for rapid construction of a bridge pier and a construction method using the inner working platform. The inner working platform comprises at least one unit module which is overlapped vertically, wherein each unit module comprises a steel structure framework, a fixed platform, movable frameworks, a movable platform, stairs and protection guardrails, wherein each steel structure framework is formed by welding structural steel; the steel structure framework of each unit module is of a two-layered structure; fixing holes are correspondingly formed in the top and the bottom of each steel structure framework; the steel structure frameworks of two layers of adjacent overlapped unit modules penetrate through the fixing holes to be connected by plugs or bolts; each fixed platform is flatly laid above each layer of structure of the corresponding steel structure framework; the movable frameworks are movably connected with the two sides of the corresponding steel structure framework by plugs; each to two sides of each layer of structure is movably connected with one movable framework; the movable platforms are flatly laid on the movable frameworks; the stairs are connected between the two layers of structures of the steel structure frameworks; the protection guardrails are arranged at the peripheries of the stairs. With the adoption of the inner working platform, the construction efficiency and the construction quality can be effectively improved. |
---|---|
Bibliography: | Application Number: CN201410668270 |