Gate dam engineering quick construction method
The invention discloses a gate dam engineering quick construction method which can be used for constructing a plurality of pairs of gate slots at the same time. The gate dam engineering quick construction method comprises the steps that A, after the bottom faces of the gate slots are constructed, co...
Saved in:
Main Authors | , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
16.07.2014
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a gate dam engineering quick construction method which can be used for constructing a plurality of pairs of gate slots at the same time. The gate dam engineering quick construction method comprises the steps that A, after the bottom faces of the gate slots are constructed, corresponding installation units are arranged on the bottom faces of the gate slots, and fixing connection pieces are arranged between adjacent instillation units; B, the fixing connection pieces are fastened; C, the installation units are adjusted to a casting state; D, first-stage concrete of all gate slots is buried synchronously; E, connection between the gate slots and gate slot installing portions is removed; F, the installation units are lifted by one casting height; G, the lower portions of the installation units are fixedly connected with the installed gate slots, and the position degrees of the instillation units are adjusted; H, operations of the steps B, C, D, F and G are executed repeatedly until the gat |
---|---|
Bibliography: | Application Number: CN201410165913 |