Large-scale operation workshop scheduling method based on bottleneck equipment decomposition
The invention discloses a large-scale operation workshop scheduling method based on bottleneck equipment decomposition. The large-scale operation workshop scheduling method based on the bottleneck equipment decomposition comprises the following steps of (1) acquiring data and modeling; (2) carrying...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
22.01.2014
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a large-scale operation workshop scheduling method based on bottleneck equipment decomposition. The large-scale operation workshop scheduling method based on the bottleneck equipment decomposition comprises the following steps of (1) acquiring data and modeling; (2) carrying out recognition on bottleneck equipment based on a key path method; (3) sorting and encoding the bottleneck equipment and non-bottleneck equipment; (4) generating an initial chromosome population; (5) carrying out cross and mutation operations on the chromosome population; (6) inoculating an immune operator to the chromosome population; (7) carrying out decoding and fitness value calculation operations on chromosomes; (8) updating an optimal chromosome and an optimal fitness value of an algorithm; (9) judging whether a method ending rule is achieved or not, starting a step (10) if the method ending rule is achieved, and otherwise, jumping to the step (5) to carry out the next iteration; (10) finding out the optimal |
---|---|
Bibliography: | Application Number: CN20131478932 |