More Information
Summary:The invention discloses a construction method for a micro-ecosystem. The construction method comprises the steps of constructing a micro ecological pond, wherein the depth of the pond is 0.4-0.6m, a mud pile with height of 15-20cm is arranged in one eighth to three eighth area of the bottom of the pond and a sand pile is additionally arranged above the surface of water in the pond; arranging a water supply and drainage system and controlling the depth of water in the micro ecological pond to be 12-14cm; collecting and fermenting human manure; cultivating earthworms and fly maggots: introducing the earthworms and the fly maggots into the micro ecological pond; planting leaf vegetables on the mud pile in spring and summer and planting watercress in autumn and winter; putting loaches, rice field eels, tortoises and Procambarus clarkii respectively according to standards of 20 loaches per square meter, 4 rice field eels per square meter, 4 tortoises per square meter and 1 pair of Procambarus clarkii per 10 square
Bibliography:Application Number: CN20131393834