Construction method of one-time excavation for large-section vertical well

The invention relates to a construction method of one-time excavation for a large-section vertical well. The method comprises the following steps: from a wellhead to the inner part of a pioneer well with the diameter of 1.4m, approximately horizontal holes radiating in an annular direction are drill...

Full description

Saved in:
Bibliographic Details
Main Authors HOU XIAOJUN, MA ZENGYI, MAO WEI, QI ZHIHUI, YI ZILIANG, YU BING, JING SULIANG, GU XINGYU, DENG SHENGBAO, WANG LAISUO, DONG ZHICUN, GUAN WEIJING, LU ZHILI
Format Patent
LanguageChinese
English
Published 03.07.2013
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to a construction method of one-time excavation for a large-section vertical well. The method comprises the following steps: from a wellhead to the inner part of a pioneer well with the diameter of 1.4m, approximately horizontal holes radiating in an annular direction are drilled in the pioneer well by using a suspension cage as an operation platform, pore-creating is achieved for one time from the bottom to the top; charging and blasting in a subsection manner are performed from the bottom to the top; slag materials fall to the lower part under the action of gravity; and the one-time excavation of the pioneer well is achieved quickly from the bottom to the top in a subsection manner. According to the technology of the method disclosed by the invention, supporting measures for a temporary well wall are not required; artificial drossing is not required; construction speed is fast; construction safety can be ensured; and construction cost is low.
Bibliography:Application Number: CN2013189299