Joint processing and constructing method of overhanging scaffold at large cantilever balcony

The invention discloses a joint processing and constructing method of an overhanging scaffold at a large cantilever balcony. The erection height of the overhanging scaffold is 19.5m; #18 I-shaped steels are adopted as horizontal overhanging rods at an overhanging section; #12.6 channel steels as inc...

Full description

Saved in:
Bibliographic Details
Main Authors SHEN RUI, SHEN FENG, MA JINBIAO, LIU JIAHUA, WEI ZHENHUAN, CHENG JUN
Format Patent
LanguageChinese
English
Published 23.01.2013
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a joint processing and constructing method of an overhanging scaffold at a large cantilever balcony. The erection height of the overhanging scaffold is 19.5m; #18 I-shaped steels are adopted as horizontal overhanging rods at an overhanging section; #12.6 channel steels as inclined supports are arranged below the horizontal overhanging rods; steel plate embedded parts of 10mm are welded below the inclined supports; the overhanging scaffolds are arranged at intervals of 1.5m; the steel tube frame above the overhanging scaffolds is erected in accordance with the requirements on a structure frame that the step distance is 1.80m, the transverse distance is 1.05m, the longitudinal distance is 1.5m, and the distance is identical to the distance of a shape steel overhanging scaffold, so that vertical rods can all be supported on the horizontal overhanging rods of the shape steel overhanging scaffold; the horizontal overhanging rods are all put on the floor and are fixed with the floor by using
Bibliography:Application Number: CN20121410589