Method for constructing inclined shaft by applying TBM (Tunnel Boring Machine) with earth pressure balancing function

The invention relates to a method for constructing an inclined shaft by applying a TBM (Tunnel Boring Machine) with an earth pressure balancing function, wherein the method comprises the following steps: (1) judging the position of a waterproof layer in the front of TBM construction before carrying...

Full description

Saved in:
Bibliographic Details
Main Authors MAO DONGHUI, LI JIANQIANG, WANG SHOUGUO, ZOU CHUNHUA, QU BO, XU WEIMING, LIU SHUSHAN, HAN BING, LEI SHENGXIANG, CHAI YONGMU
Format Patent
LanguageChinese
English
Published 28.11.2012
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to a method for constructing an inclined shaft by applying a TBM (Tunnel Boring Machine) with an earth pressure balancing function, wherein the method comprises the following steps: (1) judging the position of a waterproof layer in the front of TBM construction before carrying out TBM tunnelling construction; (2) drilling by utilizing an advanced detecting/grouting drilling machine to carry out underground water pre-discharging construction; (3) carrying out continuous downhill tunnelling construction by utilizing an inclined shaft TBM method; (4) conveying the air volume required for TBM construction to the last ring of lining segment of TBM construction equipment; (5) carrying out inclined shaft counter-slope underground water pump drainage; (6) carrying out long-distance large-gradient material transportation and deslagging; and (7) carrying out conversion construction in two tunnelling modes including a single shield TBM opening manner and an earth pressure balanced shielding manner.
Bibliography:Application Number: CN20121207191