Rail switching management right handover method

The invention discloses a rail switching management right handover method comprising the steps of S1. canceling the management right on rail switching of an operation line or a train base, wherein annunciators of both the operation line and the train base prompt alarm information and a forbidding si...

Full description

Saved in:
Bibliographic Details
Main Authors HONG HAIZHU, NIU ZHENYU, LU XIAODI, DING JIANZHONG, ZHANG QIONGYAN, LIU XUN
Format Patent
LanguageChinese
English
Published 03.10.2012
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a rail switching management right handover method comprising the steps of S1. canceling the management right on rail switching of an operation line or a train base, wherein annunciators of both the operation line and the train base prompt alarm information and a forbidding signal is displayed on management right indicators of the operation line and the train base respectively; S2. turning off a management right switch at the operation line; S3. turning off a confirmation switch at the train base; S4 enabling the operation line to obtain the management right on control of rail switching and turning off the annunciators of the operation line and the train base; and S5. controlling the rail switching by the operation line and allowing a train to enter the train base through the operation line. By adoption of an application-conformation combination way, the attribution of the management right between the train base and the operation line is effectively divided, so that a parking problem ca
Bibliography:Application Number: CN20121179459