Boiling chlorination furnace and manufacturing method thereof

The invention discloses a boiling chlorination furnace with a longer equipment using period and a manufacturing method of the boiling chlorination furnace. The boiling chlorination furnace comprises a boiling segment, an expansion segment arranged above the boiling segment, a straight tubular segmen...

Full description

Saved in:
Bibliographic Details
Main Authors QIN CHUAN, JIANG HUI, WU RONGSHAN, FENG SHUXIONG
Format Patent
LanguageChinese
English
Published 27.06.2012
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a boiling chlorination furnace with a longer equipment using period and a manufacturing method of the boiling chlorination furnace. The boiling chlorination furnace comprises a boiling segment, an expansion segment arranged above the boiling segment, a straight tubular segment arranged above the expansion segment and a furnace lid with an exhaust hole, wherein the furnace lid is arranged above the straight tubular segment; and the boiling furnace comprises a furnace shell, an acid resisting concrete layer, a phosphate cement layer and an anticorrosive coating layer, wherein the furnace shell is used for forming the shape of the boiling segment and protecting the inside structure of the boiling segment; the acid resisting concrete layer is formed inside the furnace shell; the phosphate cement layer is formed inside the acid resisting concrete layer, and the anticorrosive coating layer is formed inside the phosphate cement layer.
Bibliography:Application Number: CN20111351910