Construction method of deformable template of variable cross-section high pier

The invention discloses a construction method of a deformable template of a variable cross-section high pier, which comprises the step of installation of each pouring section external mould assembly, wherein each pouring section external mould comprises a plurality of layers of templates which are f...

Full description

Saved in:
Bibliographic Details
Main Authors LIU QIANLIN, PAN ZHENGHUA, XU JILI, SHI FEI, WEI HEGUANG, XIONG WEISHI, ZENG HAO
Format Patent
LanguageChinese
English
Published 19.10.2011
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a construction method of a deformable template of a variable cross-section high pier, which comprises the step of installation of each pouring section external mould assembly, wherein each pouring section external mould comprises a plurality of layers of templates which are fixedly superposed together in sequence from bottom to up; each layer of template is formed by the encircling of two transverse templates and two longitudinal templates; the transverse templates are rectangular and have the width equal to that of a pier; the longitudinal templates are isosceles trapezoid and have the altitude equal to that of the transverse templates; and the next step of operation can be conducted according to the existing method after the installation of each pouring section external mould assembly is completed. With the method, a tower crane and a large template are omitted, the cost is saved, the defect that a large device is difficult to transport in an access road in mountain area is overcome,
Bibliography:Application Number: CN2011199517