Synchronous and fast construction method and device for cantilever-cast continuous girder No.0 block and lower structure

The invention provides a synchronous and fast construction method and a synchronous and fast construction device for a cantilever-cast continuous girder No.0 block and a lower structure. The construction comprises the following steps of: building a continuous girder No.0 block assembly platform on o...

Full description

Saved in:
Bibliographic Details
Main Authors WANG SHI, LIU XIAOXIA, WU ZONGPING, MENG GANG, CHA BENYI, YU XIANGJUN, LIU XUEMING, BAI BOYUAN, WU XIAOJUN, GENG ZENGXIAN, QIN SHUNQUAN
Format Patent
LanguageChinese
English
Published 11.05.2011
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides a synchronous and fast construction method and a synchronous and fast construction device for a cantilever-cast continuous girder No.0 block and a lower structure. The construction comprises the following steps of: building a continuous girder No.0 block assembly platform on one side of a centre line of a bridge during pier body construction of the lower structure, and mounting a sliding channel; mounting brackets, templates, steel bars and prestressed pipe bundles for No.0 block construction on the assembly platform; mounting pier-side brackets and sliding channels after the pier body construction is finished, and connecting the sliding channels with the sliding channel of the assembly platform; mounting a No.0 block traction device; wholly sliding and placing the No.0 block templates, steel bars and the like through the traction device; and pouring No.0 block concrete. The invention has the advantages that: various processes are reasonably arranged, the time is saved, and the construc
Bibliography:Application Number: CN20101586136