Method for mounting medium-deep buried water stop of tunnel archwall lining concrete toroidal construction joint
The invention provides a method for mounting a medium-deep buried water stop of a tunnel archwall lining concrete toroidal construction joint, which comprises the following steps of: making a trolley in place; closing a template and fixing the medium-deep buried water stop to form an L shape by usin...
Saved in:
Main Authors | , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
29.12.2010
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides a method for mounting a medium-deep buried water stop of a tunnel archwall lining concrete toroidal construction joint, which comprises the following steps of: making a trolley in place; closing a template and fixing the medium-deep buried water stop to form an L shape by using a medium-deep buried water stop positioning hoop; casting and curing the concrete; and demolding, after an end wooden template is removed, straightening the medium-deep buried water stop positioning hoop and straightening the medium-deep buried water stop simultaneously so as to change the L-shaped medium-deep buried water stop into a straight medium-deep buried water stop. The method for mounting the medium-deep buried water stop simplifies the procedures of erecting and demolding of the end template of the trolley, increases the working efficiency, particularly increases positioning accuracy of the medium-deep buried water stop and perfectly protects the medium-deep buried water stop, and greatly improves the c |
---|---|
Bibliography: | Application Number: CN20101225438 |