Method for mounting medium-deep buried water stop of tunnel archwall lining concrete toroidal construction joint

The invention provides a method for mounting a medium-deep buried water stop of a tunnel archwall lining concrete toroidal construction joint, which comprises the following steps of: making a trolley in place; closing a template and fixing the medium-deep buried water stop to form an L shape by usin...

Full description

Saved in:
Bibliographic Details
Main Authors LI HENGJIE, XU TENG, LIN LIN, JIANG HUIGUANG, LIU JUNCHENG, CHEN QINGHUAI, TANG SHAOWU, WANG JUNTAO
Format Patent
LanguageChinese
English
Published 29.12.2010
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides a method for mounting a medium-deep buried water stop of a tunnel archwall lining concrete toroidal construction joint, which comprises the following steps of: making a trolley in place; closing a template and fixing the medium-deep buried water stop to form an L shape by using a medium-deep buried water stop positioning hoop; casting and curing the concrete; and demolding, after an end wooden template is removed, straightening the medium-deep buried water stop positioning hoop and straightening the medium-deep buried water stop simultaneously so as to change the L-shaped medium-deep buried water stop into a straight medium-deep buried water stop. The method for mounting the medium-deep buried water stop simplifies the procedures of erecting and demolding of the end template of the trolley, increases the working efficiency, particularly increases positioning accuracy of the medium-deep buried water stop and perfectly protects the medium-deep buried water stop, and greatly improves the c
Bibliography:Application Number: CN20101225438