Method of installing ship bilge equipment
The process of manufacturing outfitting for ship engine room bottom floor includes the following steps: drawing midship line, rib site line, longitudinal line and inner bottom plate edge line in the internal field with the longitudinal line as datum, and setting height line on wall or upright to det...
Saved in:
Main Author | |
---|---|
Format | Patent |
Language | English |
Published |
12.09.2007
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The process of manufacturing outfitting for ship engine room bottom floor includes the following steps: drawing midship line, rib site line, longitudinal line and inner bottom plate edge line in the internal field with the longitudinal line as datum, and setting height line on wall or upright to determine the grille height and base height; erecting uprights for the grille frame, splicing grille plane and welding to the uprights; locating the apparatus base and maintenance platform on the grille; installing apparatus on the base and maintenance platform; mounting pipe supports, pipes, valves and accessories; and hoisting the installed outfitting onto the ship. The process can shorten the operation period in dock, raise operation efficiency, improve operation condition, raise safety and lower ship building cost. |
---|---|
Bibliography: | Application Number: CN2007139236 |