VERFAHREN ZUR LEISTUNGSMAESSIG GESTEUERTEN INBETRIEBNAHME BZW. ABSCHALTUNG VON HEIZKESSELN
The method allows the optimum-energy switching on and switching off of heating boilers (HK1, HK2) of a boiler cascade acting on a common forward and return flow (1 and 2). The instantaneous power of each heating boiler (HK1, HK2) is recorded by means of the switch-on ratio ( epsilon ) of each burner...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | German |
Published |
31.10.1988
|
Edition | 4 |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The method allows the optimum-energy switching on and switching off of heating boilers (HK1, HK2) of a boiler cascade acting on a common forward and return flow (1 and 2). The instantaneous power of each heating boiler (HK1, HK2) is recorded by means of the switch-on ratio ( epsilon ) of each burner (13, 15). The switching on and switching off of the heating boilers is initiated as a result of the power balance and taking into account the economic working point of each heating boiler (HK1, HK2). |
---|---|
Bibliography: | Application Number: CH19850001732 |