APPARATUS AND METHODS FOR WELL CONTROL

A completion joint 100 has two sand control jackets 120A-B connected on each end of an intermediately-mounted inflow control device 130. Both jackets 120A-B communicate with a housing chamber 155 through dedicated open end-rings 140A-B. The basepipe's flow openings 1 18 are isolated from this h...

Full description

Saved in:
Bibliographic Details
Main Authors MOFFETT, TRACY J, SLADIC, JOHN S, HALL, CHRISTOPHER A, MCNAMEE, STEPHEN, YEH, CHARLES S
Format Patent
LanguageEnglish
French
Published 18.07.2017
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:A completion joint 100 has two sand control jackets 120A-B connected on each end of an intermediately-mounted inflow control device 130. Both jackets 120A-B communicate with a housing chamber 155 through dedicated open end-rings 140A-B. The basepipe's flow openings 1 18 are isolated from this housing chamber 155 by a sleeve 160 fitted with flow ports 170. The housing 150 is removable to allow access to the flow ports 170 for pinning to configure the ports 170 open or closed for a given implementation. La présente invention concerne un joint (100) de complétion, qui possède deux chemises (120A-B) de régulation du sable, reliées à chaque extrémité d'un dispositif (130) de commande d'entrée monté intermédiaire. Les deux chemises (120A-B) communiquent avec une chambre (155) de logement à travers des anneaux (140A-B) d'embout ouverts dédiés. Les ouvertures (118) d'écoulement du tube de base sont isolées de cette chambre (155) de logement par un manchon (160) doté d'orifices (170) d'écoulement. Le logement (150) est amovible, afin de permettre l'accès aux orifices (170) d'écoulement pour fixation, afin de configurer les orifices (170) en ouverture ou en fermeture pour une mise en uvre donnée.
Bibliography:Application Number: CA20142901982