RECOVERY OF BITUMEN BY STEAM INJECTION

A method of recovering bitumen from a subterranean tar sand formation by the following multi-step method. First, an injection well is drilled to the formation and cased. Perforations are provided in the portion of the injection well contacting the formation. Next, a plurality of production wells are...

Full description

Saved in:
Bibliographic Details
Main Authors STRIEGLER, JOHN H, HOWELL, EDDIE P
Format Patent
LanguageEnglish
Published 23.05.1978
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:A method of recovering bitumen from a subterranean tar sand formation by the following multi-step method. First, an injection well is drilled to the formation and cased. Perforations are provided in the portion of the injection well contacting the formation. Next, a plurality of production wells are drilled and completed into the formation positioned above and along the length of the injection well. Thereafter, a heated fluid is circulated through the injection well contacting the formation via the perforations and thereby reducing the viscosity of the bitumen contained therein rendering same mobile. Subsequently, the mobilized bitumen is recovered through the plurality of production wells.
Bibliography:Application Number: CA19760248491