Summary:A METHOD OF, AND A SYSTEM FOR, CONTROLLING A DRILLING OPERATION A system 10 for controlling a drilling operation by a drill rig 12 includes a receiver 16 for receiving sensed data related to the drilling operation. A processor 18 is in communication with the receiver 16, the processor 18 processing the sensed data to estimate at least one geological property of interest of a zone 20 in which the drill rig 12 is active. The processor 18 is configured to operate as a decision engine 22 to optimise the drilling operation automatically by changing at least one drilling related parameter during the drilling operation based on the at least one geological property of interest. 60 C)C40 \34 32 j11Z966 fjg~.j 14 Fig3 2 000000 o2 64-34