Handling heavy subsea structures

A method for transporting and installing a heavy subsea structure such as a subsea processing centre (10) for produced crude oil or natural gas. The method comprises: controlledly flooding at least one ballast tank (52) attached to or incorporated into the structure, to the extent that the structure...

Full description

Saved in:
Bibliographic Details
Main Author Daasvatn, Sigbjorn
Format Patent
LanguageEnglish
Published 01.06.2017
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:A method for transporting and installing a heavy subsea structure such as a subsea processing centre (10) for produced crude oil or natural gas. The method comprises: controlledly flooding at least one ballast tank (52) attached to or incorporated into the structure, to the extent that the structure becomes negatively buoyant at a predetermined towing depth; towing the negatively-buoyant structure at the towing depth by the Controlled Depth Towing Method (CDTM); and, after towing to the installation location, further flooding the ballast tank to lower the structure onto the seabed (64). At the seabed, a fluid transportation pipe (90) of a subsea production installation may be coupled to pipework of the structure.
Bibliography:Application Number: AU20150341739