Method of optimizing conductivity in a hydraulic fracturing operation
A method of distributing proppant in a spatial arrangement throughout a created or enlarged fracture by pumping into a subterranean formation penetrated by a well multiple stages of fracturing fluid wherein a fluid laden with proppant is pumped into the well and a fluid substantially free of proppan...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | English |
Published |
03.03.2016
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | A method of distributing proppant in a spatial arrangement throughout a created or enlarged fracture by pumping into a subterranean formation penetrated by a well multiple stages of fracturing fluid wherein a fluid laden with proppant is pumped into the well and a fluid substantially free of proppant is then pumped into the well; the fluid of the fluid laden with proppant and the fluid substantially free of proppant being the same. Vertically extending pillars are created within the formation. Fluid produced from the hydrocarbon-bearing reservoir is then flowed at least partially through channels between the vertically extending pillars. |
---|---|
Bibliography: | Application Number: AU20140327012 |