Preliminary Study on the Integration Scheme of Marine Habitat Construction for Offshore Wind Farm Project
With the advent of “carbon peak” and “carbon neutral” times, wind power, as the main body of new power system construction, is a renewable energy that has been focused on development in China, and has been widely used. The evaluation system was constructed from the aspects of policy compliance, hydr...
Saved in:
Published in | Hai yang kai fa yu guan li Vol. 41; no. 5; pp. 132 - 137 |
---|---|
Main Authors | , , , |
Format | Journal Article |
Language | Chinese |
Published |
Editorial Office of Ocean Development and Management
01.05.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | With the advent of “carbon peak” and “carbon neutral” times, wind power, as the main body of new power system construction, is a renewable energy that has been focused on development in China, and has been widely used. The evaluation system was constructed from the aspects of policy compliance, hydrological conditions, construction location and important places for fish, Jinshan offshore wind farm phase II was taken as an example to explore the integration construction of marine ranching and offshore wind farm. The results show that due to the velocity, depth, water quality environment and other reasons, Jinshan offshore wind farm phase II site does not have the conditions for the construction of marine ranching and artificial reef construction. It is suggested to gradually form a virtuous cycle of marine ecological environment by means of releasing ecological reefs, multiplying and releasing them. Based on the above work, the integration scheme of offshore wind farm and marine ranching construction is initia |
---|---|
ISSN: | 1005-9857 |