Determination of Industrial Enterprise Contract Demand Being Part of Maximum Power System Load

The paper considers a regime and economic essence of the problem pertaining to determination of the customer contract demand for industrial consumers of electric power with connected load of Sпp > 250 kV×A. A method for determination of the electric power customer half-hour maximum demand is prop...

Full description

Saved in:
Bibliographic Details
Published inĖnergetika (Minsk, Belarus) no. 1; pp. 9 - 11
Main Authors V. N. Radkevich, О. А. Trifonova
Format Journal Article
LanguageRussian
Published Belarusian National Technical University 01.02.2011
Online AccessGet full text

Cover

Loading…
More Information
Summary:The paper considers a regime and economic essence of the problem pertaining to determination of the customer contract demand for industrial consumers of electric power with connected load of Sпp > 250 kV×A. A method for determination of the electric power customer half-hour maximum demand is proposed in the paper. The method is based on the calculation of daily average active load and utilization factor with due account of the occurrence probability of a calculated maximum load value.
ISSN:1029-7448
2414-0341