Conversion Scheme Design of Power Supply Return Mode for Metro Connection Lines

Objective The metro lines connected by connection line may adopt different power supply current return modes. In order to improve the efficiency of train line transfer, it is necessary to set up the return mode conversion section within the connection line and design the return mode conversion schem...

Full description

Saved in:
Bibliographic Details
Published inChengshi Guidao Jiaotong Yanjiu Vol. 27; no. 9; pp. 176 - 180
Main Authors WANG Jianbo, CHEN Qingyun, WU Lian
Format Journal Article
LanguageChinese
Published Urban Mass Transit Magazine Press 01.09.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Objective The metro lines connected by connection line may adopt different power supply current return modes. In order to improve the efficiency of train line transfer, it is necessary to set up the return mode conversion section within the connection line and design the return mode conversion scheme, which shall meet the demand of using the running rail and the return rail to return current. Method With Shaoxing Metro Line 1 (hereinafter referred to as "Line 1") and the first phase project of Shaoxing Metro Line 2 (hereinafter referred to as "Line 2") as examples, the overview of the two lines and details of the connection line are introduced. From the aspects of operation conditions, economy and engineering feasibility, three design schemes (Scheme 1, Scheme 2 and Scheme 3) for the power supply return mode conversion within the connection line are proposed, and their advantages and disadvantages are analyzed respectively. Result & Conclusion Scheme 3 is recommended. It can not only effectively solve the pro
ISSN:1007-869X
DOI:10.16037/j.1007-869x.2024.09.031