Development and Preliminary Commissioning Results of a Long Pulse 140 GHz ECRH System on EAST Tokamak(Invited)
A long pulse electron cyclotron resonance heating(ECRH)system has been developed to meet the requirements of steady-state operation for the EAST superconducting tokamak,and the first EC wave was successfully injected into plasma during the 2015 spring campaign.The system is mainly composed of four 1...
Saved in:
Published in | 等离子体科学与技术:英文版 no. 4; pp. 442 - 448 |
---|---|
Main Author | |
Format | Journal Article |
Language | English |
Published |
2016
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | A long pulse electron cyclotron resonance heating(ECRH)system has been developed to meet the requirements of steady-state operation for the EAST superconducting tokamak,and the first EC wave was successfully injected into plasma during the 2015 spring campaign.The system is mainly composed of four 140 GHz gyrotron systems,4 ITER-Like transmission lines,4 independent channel launchers and corresponding power supplies,a water cooling,control &inter-lock system etc.Each gyrotron is expected to deliver a maximum power of 1 MW and be operated at 100-1000 s pulse lengths.The No.1 and No.2 gyrotron systems have been installed.In the initial commissioning,a series of parameters of 1 MW 1 s,900 k W 10 s,800 k W 95 s and650 k W 753 s have been demonstrated successfully on the No.1 gyrotron system based on calorimetric dummy load measurements.Significant plasma heating and MHD instability suppression effects were observed in EAST experiments.In addition,high confinement(H-mode)discharges triggered by ECRH were obtained. |
---|---|
Bibliography: | gyrotron system ECRH millimeter wave EAST steady-state operation 34-1187/TL A long pulse electron cyclotron resonance heating(ECRH)system has been developed to meet the requirements of steady-state operation for the EAST superconducting tokamak,and the first EC wave was successfully injected into plasma during the 2015 spring campaign.The system is mainly composed of four 140 GHz gyrotron systems,4 ITER-Like transmission lines,4 independent channel launchers and corresponding power supplies,a water cooling,control &inter-lock system etc.Each gyrotron is expected to deliver a maximum power of 1 MW and be operated at 100-1000 s pulse lengths.The No.1 and No.2 gyrotron systems have been installed.In the initial commissioning,a series of parameters of 1 MW 1 s,900 k W 10 s,800 k W 95 s and650 k W 753 s have been demonstrated successfully on the No.1 gyrotron system based on calorimetric dummy load measurements.Significant plasma heating and MHD instability suppression effects were observed in EAST experiments.In addition,high confinement(H-mode)discharges triggered by ECRH were obtained. |
ISSN: | 1009-0630 |