ASPECTS REGARDING THE EFFICIENCY ACHIEVEDBY REPLACING THE AUXILIARY GENERATOR WITH ELECTRICAL TRANSFORMER OF 20 / 0.6 KV AT THE SYNCHRONOUS GENERATORS OF 330 MW
In this paper is being analyzed the possibly of replacing the auxiliary generator of a synchronous generator of 330 MW with an electrical transformer with transforming report of 20 / 0.6 kVconnected to the generator stator winding terminals. In this paper is presented how to replace the auxiliary ge...
Saved in:
Published in | International Multidisciplinary Scientific GeoConference : SGEM Vol. 2; pp. 79 - 84 |
---|---|
Main Authors | , |
Format | Conference Proceeding |
Language | English |
Published |
Sofia
Surveying Geology & Mining Ecology Management (SGEM)
01.01.2016
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | In this paper is being analyzed the possibly of replacing the auxiliary generator of a synchronous generator of 330 MW with an electrical transformer with transforming report of 20 / 0.6 kVconnected to the generator stator winding terminals. In this paper is presented how to replace the auxiliary generator related to a synchronous generator of 330 MW and the efficiency broughtto the monitoring, adjustmentand control system of the excitation of a synchronous generator of 330 MW. |
---|---|
ISSN: | 1314-2704 |