BF 인증등급 향상을 위한 BIM 기반 혼합현실 적용 방안

The government has implemented the BF certification system since 2008 to improve the quality of life and health. For the BF certification, the person who wants to certify must submit their own evaluation report, 2D drawings and on-site photographs to the responsible agency. After that, certification...

Full description

Saved in:
Bibliographic Details
Published in한국CDE학회 논문집 Vol. 24; no. 2; pp. 211 - 222
Main Authors 김예담(Ye Dam Kim), 추승연(Seung Yeon Choo), 서지효(Ji Hyo Seo), 김태훈(Tae Hoon Kim)
Format Journal Article
LanguageKorean
Published (사)한국CDE학회 01.06.2019
한국CDE학회
Subjects
Online AccessGet full text
ISSN2508-4003
2508-402X
DOI10.7315/CDE.2019.211

Cover

More Information
Summary:The government has implemented the BF certification system since 2008 to improve the quality of life and health. For the BF certification, the person who wants to certify must submit their own evaluation report, 2D drawings and on-site photographs to the responsible agency. After that, certification is conducted through the examination of the certification judging panel and the certification examination committee. The certification organization evaluates the evaluation by the self-evaluation, 2D drawing, and on-site inspection. The site inspection can be confirmed the construction has been completed. Therefore, it is necessary to make a design change or rework only for the BF certification at the time of completion or completion. Therefore, in this study, we proposed a method to evaluate the BF certification level in advance from the design phase of the building in order to prevent the design change and re - construction due to the BF certification system and to improve the time and economic efficiency. As a result, the BIM model was visualized as a mixed reality device, and the presence of the BF element, the installation location, and the appropriateness of the installation were confirmed. KCI Citation Count: 0
ISSN:2508-4003
2508-402X
DOI:10.7315/CDE.2019.211