고정상 담체를 적용한 MS-BNR공정에서 운전인자의 변화에 따른 영양염류 제거특성
Fixed Bio-ring applied Multi-stage Step-feed Biological Nutrient Removal(MS-BNR) has been developed to improve traditional waste water treatment system. This paper examines and appraises the correlation between operation conditions, such as water temperature, HRT, C/N ratio, C/P ratio, F/M ratio and...
Saved in:
Published in | 한국수처리학회지, 16(4) pp. 27 - 35 |
---|---|
Main Authors | , |
Format | Journal Article |
Language | Korean |
Published |
한국수처리학회
01.12.2008
|
Subjects | |
Online Access | Get full text |
ISSN | 1225-7192 2289-0076 |
Cover
Summary: | Fixed Bio-ring applied Multi-stage Step-feed Biological Nutrient Removal(MS-BNR) has been developed to improve traditional waste water treatment system. This paper examines and appraises the correlation between operation conditions, such as water temperature, HRT, C/N ratio, C/P ratio, F/M ratio and BOD5 removal efficiency, and nutrients removal efficiencies especially total nitrogen and phosphorus on MS-BNR system of D waste water treatment in Korea.
The result of this study shows that even though nutrients removal efficiencies have low interrelation to water temperature, in case of HRT, C/N, C/P, F/M and BOD5 Removal Efficiency, nutrients removal efficiencies of MS-BNR have high correlation amid them. To achieve high nutrients removal efficiencies, fixed Bio-ring applied MS-BNR Process needs over 4 of C/N and 30 of C/P ratio, over 95% of BOD5 removal efficiency, between 19 to 23 hours of HRT, and between 0.04 to 0.08 of F/M ratio.
Fixed Bio-ring applied Multi-stage Step-feed Biological Nutrient Removal(MS-BNR) has been developed to improve traditional waste water treatment system. This paper examines and appraises the correlation between operation conditions, such as water temperature, HRT, C/N ratio, C/P ratio, F/M ratio and BOD5 removal efficiency, and nutrients removal efficiencies especially total nitrogen and phosphorus on MS-BNR system of D waste water treatment in Korea.
The result of this study shows that even though nutrients removal efficiencies have low interrelation to water temperature, in case of HRT, C/N, C/P, F/M and BOD5 Removal Efficiency, nutrients removal efficiencies of MS-BNR have high correlation amid them. To achieve high nutrients removal efficiencies, fixed Bio-ring applied MS-BNR Process needs over 4 of C/N and 30 of C/P ratio, over 95% of BOD5 removal efficiency, between 19 to 23 hours of HRT, and between 0.04 to 0.08 of F/M ratio. KCI Citation Count: 0 |
---|---|
Bibliography: | G704-001415.2008.16.4.013 |
ISSN: | 1225-7192 2289-0076 |