KASS 시스템 통합 및 검증 활동
Korea augmentation satellite system (KASS) integration, verification, qualification (IVQ) activity is verification of requirements for KASS system and its sub-system that were performed based on the inspection, analysis, review of design, test (IART) method from factory acceptance test (FAT) to test...
Saved in:
Published in | 한국항행학회논문지 Vol. 27; no. 6; pp. 782 - 787 |
---|---|
Main Authors | , , , , , |
Format | Journal Article |
Language | Korean |
Published |
한국항행학회
01.12.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | Korea augmentation satellite system (KASS) integration, verification, qualification (IVQ) activity is verification of requirements for KASS system and its sub-system that were performed based on the inspection, analysis, review of design, test (IART) method from factory acceptance test (FAT) to test readiness review (TRR) after critical design review (CDR) was closed. In the FAT phase, developed equipment was installed on the test platform and we were verified interfaces between sub-systems and coupling test with the kass control station (KCS). In the site aceeptance test (SAT) phase, on-site verification was conducted by installing equipment verified by FAT such as kass reference station (KRS), kass processing station (KPS), kass uplink station (KUS), KCS. However, considering the developed plan and status, SAT was divided into 3 phases and coupling test was performed. In the TRR phase, the KASS system verification was performed through FAT's test list and additional test list using the satellite based augmentation system (SBAS) broadcast signal from geostationary earth orbit (GEO) 1. KASS (korea augmentation satellite system) 시스템 통합 및 검증(IVQ; integration, verification, qualification) 활동은 시스템 및 하위시스템 요구사항 검증 활동으로 IART(inspection, analysis, review of design, test) 기반으로 상세설계 (CDR; critical design review) 이후 하위시스템 공장수락시험 (FAT; factory acceptance test)부터 현장수락시험 (SAT; site acceptance test) 그리고 시스템 통합 검증 시험 (TRR; test readiness review) 까지 수행하였다. FAT 단계의 활동은 개발된 장비를 테스트 플랫폼에 설치하고 각 장비별 인터페이스 검증과 통합운영국(KCS; kass control station)과의 연동시험을 통해 성능을 검증하였다. SAT 단계의 활동은 FAT 단계에서 검증된 KRS (kass reference station), KPS (kass processing station), KUS (kass uplink station), KCS를 운영 현장에 설치하고 검증하는 단계이며 개발 일정 및 여건을 고려하여 3단계로 구분하여 수행하였다. TRR 단계의 활동은 항공위성1호기에서 방송되는 SBAS (satellite based augmentation system) 메시지를 이용하여 SAT을 통해 검증된 장비를 FAT 단계에 수행했던 시험 항목과 추가 시험 항목 검증을 통해 전체 시스템에 대한 성능 검증을 완료하였다. |
---|---|
Bibliography: | KISTI1.1003/JNL.JAKO202303149925420 |
ISSN: | 1226-9026 2288-842X |