건설 공정계획 자동화와 시각화를 위한 가산 그리드 공정계획 기법(CSM)과 CSM기반 소프트로직 알고리즘 개발 연구

Schedule management is one of pivotal project success factors during construction projects. However, there are many difficulties in rapid scheduling and controlling since the existing planning techniques require considerable amount of manual work and manager's judgment in a construction project...

Full description

Saved in:
Bibliographic Details
Published in한국건설관리학회 논문집, 23(4) Vol. 23; no. 4; pp. 65 - 77
Main Authors 최흥순, 문성현, 지석호, Choi, Heungsoon, Moon, Seonghyeon, Chi, Seokho
Format Journal Article
LanguageKorean
Published 한국건설관리학회 01.07.2022
Subjects
Online AccessGet full text
ISSN2005-6095
2465-9703

Cover

Abstract Schedule management is one of pivotal project success factors during construction projects. However, there are many difficulties in rapid scheduling and controlling since the existing planning techniques require considerable amount of manual work and manager's judgment in a construction project. This research aims to propose a new scheduling method and algorithm for automating and visualizing the planning process, which is called Countable-grid scheduling method. In this method, if the scope of work is defined via a visualized tool, the schedule plan is created automatically according to the productivity and workable conditions of each activity. The location of the work for each date can be visualized in grid-based approach. Moreover, the work schedule can be updated automatically according to the progress. The industrial applicability of the proposed method was verified in construction projects via case study with sample data. This research can contribute to the construction industry by automating the construction schedule management process. 공정관리는 건설 프로젝트에서 가장 중요한 프로젝트 성공 요인 중 하나이다. 그러나, 기존의 공정계획 기법은 건설 프로젝트에서 상당한 수작업과 관리자의 판단이 필요하기 때문에 신속한 공정계획과 운영에 많은 어려움이 있다. 본 연구는 공정계획을 자동화하고 시각화하기 위한 새로운 공정계획 기법과 알고리즘을 제안하는 것을 목적으로 하며, 이를 가산 그리드 공정계획 기법(CSM)이라고 한다. 이 기법은 시각화된 도구를 통해 작업 범위를 정의하면 각 작업의 생산성과 작업 가능 조건에 따라 일정계획이 자동으로 생성된다. 날짜별 작업의 위치를 그리드 기반 접근방식으로 시각화할 수 있다. 또한 작업 일정은 진행 상황에 따라 자동으로 갱신할 수 있다. 제안된 기법의 산업적 활용 가능성을 건설프로젝트의 샘플 데이터를 가지고 사례 연구를 통해 검증하였다. 본 연구는 공정관리 프로세스를 자동화하여 건설 산업에 기여할 수 있을 깃으로 기대한다.
AbstractList Schedule management is one of pivotal project success factors during construction projects. However, there are many difficulties in rapid scheduling and controlling since the existing planning techniques require considerable amount of manual work and manager's judgment in a construction project. This research aims to propose a new scheduling method and algorithm for automating and visualizing the planning process, which is called Countable-grid scheduling method. In this method, if the scope of work is defined via a visualized tool, the schedule plan is created automatically according to the productivity and workable conditions of each activity. The location of the work for each date can be visualized in grid-based approach. Moreover, the work schedule can be updated automatically according to the progress. The industrial applicability of the proposed method was verified in construction projects via case study with sample data. This research can contribute to the construction industry by automating the construction schedule management process. 공정관리는 건설 프로젝트에서 가장 중요한 프로젝트 성공 요인 중 하나이다. 그러나, 기존의 공정계획 기법은 건설 프로젝트에서 상당한 수작업과 관리자의 판단이 필요하기 때문에 신속한 공정계획과 운영에 많은 어려움이 있다. 본 연구는 공정계획을 자동화하고 시각화하기 위한 새로운 공정계획 기법과 알고리즘을 제안하는 것을 목적으로 하며, 이를 가산 그리드 공정계획 기법(CSM)이라고 한다. 이 기법은 시각화된 도구를 통해 작업 범위를 정의하면 각 작업의 생산성과 작업 가능 조건에 따라 일정계획이 자동으로 생성된다. 날짜별 작업의 위치를 그리드 기반 접근방식으로 시각화할 수 있다. 또한 작업 일정은 진행 상황에 따라 자동으로 갱신할 수 있다. 제안된 기법의 산업적 활용 가능성을 건설프로젝트의 샘플 데이터를 가지고 사례 연구를 통해 검증하였다. 본 연구는 공정관리 프로세스를 자동화하여 건설 산업에 기여할 수 있을 깃으로 기대한다.
공정관리는 건설 프로젝트에서 가장 중요한 프로젝트 성공 요인 중 하나이다. 그러나, 기존의 공정계획 기법은 건설 프로젝트에서 상당한 수작업과 관리자의 판단이 필요하기 때문에 신속한 공정계획과 운영에 많은 어려움이 있다. 본 연구는 공정계획을 자동화하고 시각화하기 위한 새로운 공정계획 기법과 알고리즘을 제안하는 것을 목적으로 하며, 이를 가산 그리드 공정계획 기법(CSM)이라고 한다. 이 기법은 시각화된 도구를 통해 작업 범위를 정의하면 각 작업의 생산성과 작업 가능 조건에 따라 일정계획이 자동으로 생성된다. 날짜별 작업의 위치를 그리드 기반 접근방식으로 시각화할 수 있다. 또한 작업 일정은 진행 상황에 따라 자동으로 갱신할 수 있다. 제안된 기법의 산업적 활용 가능성을 건설프로젝트의 샘플 데이터를 가지고 사례 연구를 통해 검증하였다. 본 연구는 공정관리 프로세스를 자동화하여 건설 산업에 기여할 수 있을 깃으로 기대한다. Schedule management is one of pivotal project success factors during construction projects. However, there are many difficulties in rapid scheduling and controlling since the existing planning techniques require considerable amount of manual work and manager's judgment in a construction project. This research aims to propose a new scheduling method and algorithm for automating and visualizing the planning process, which is called Countable-grid scheduling method. In this method, if the scope of work is defined via a visualized tool, the schedule plan is created automatically according to the productivity and workable conditions of each activity. The location of the work for each date can be visualized in grid-based approach. Moreover, the work schedule can be updated automatically according to the progress. The industrial applicability of the proposed method was verified in construction projects via case study with sample data. This research can contribute to the construction industry by automating the construction schedule management process. KCI Citation Count: 0
Author 문성현
Choi, Heungsoon
지석호
최흥순
Moon, Seonghyeon
Chi, Seokho
Author_xml – sequence: 1
  fullname: 최흥순
– sequence: 2
  fullname: 문성현
– sequence: 3
  fullname: 지석호
– sequence: 4
  fullname: Choi, Heungsoon
– sequence: 5
  fullname: Moon, Seonghyeon
– sequence: 6
  fullname: Chi, Seokho
BackLink https://www.kci.go.kr/kciportal/ci/sereArticleSearch/ciSereArtiView.kci?sereArticleSearchBean.artiId=ART002863006$$DAccess content in National Research Foundation of Korea (NRF)
BookMark eNpVjMtKw0AYhYMoWKvvMBtBhcDMZGYyXZbiXSlo98EkEwmRFowPoBJceEHBVq0EqaB100W0FrvoE00m72C0blx9__k555vRJuuNupjQCpgwqpdMaEzmN4RUZ7BEp7W5MPRtCDmhyDRJQbuT758qegGyP1CdluxH2eMVUE836XU7azdV-xioi1gmJ3lIX0dAxVHWioFMjtVpAuTXMO320tv4_1wOk_SjtVDZ3V6U_RHI-fNJHoA6u8yaUXY-TJ9j9XYCVOtS9ju5QnUfcmecJjFQ94kc9Ga1KW_vIBRzfyxqtZXlWmVN36qurlfKW3rAKNK56TgEUg-ZAntEMNfAdkkIZruC2gYyiIOgyx0XIgM6zMa2YwoOmUm4xzEUtlHUlsba-qFnBY5vNfb8X-43rODQKu_U1i0EIeacobw8Py4HfnjkW3U3PLA2yptVDDHGiBGDIJMSbnwDg6eewA
ContentType Journal Article
DBID JDI
ACYCR
DEWEY 690
DatabaseName KoreaScience
Korean Citation Index
DatabaseTitleList

DeliveryMethod fulltext_linktorsrc
Discipline Engineering
DocumentTitleAlternate Countable-grid Scheduling Method (CSM) and CSM-based Soft-logic Algorithm Development for Automated Construction Scheduling and Visualization
EISSN 2465-9703
EndPage 77
ExternalDocumentID oai_kci_go_kr_ARTI_10028861
JAKO202221643417548
GroupedDBID .UV
JDI
ACYCR
ID FETCH-LOGICAL-k651-87cc405f17e2f4e6d32b9ee6bde5b3134c10d8cd0130c6b2bc7e806748f820eb3
ISSN 2005-6095
IngestDate Wed Dec 20 03:39:02 EST 2023
Fri Dec 22 11:58:53 EST 2023
IsOpenAccess true
IsPeerReviewed false
IsScholarly false
Issue 4
Language Korean
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-k651-87cc405f17e2f4e6d32b9ee6bde5b3134c10d8cd0130c6b2bc7e806748f820eb3
Notes KISTI1.1003/JNL.JAKO202221643417548
OpenAccessLink http://click.ndsl.kr/servlet/LinkingDetailView?cn=JAKO202221643417548&dbt=JAKO&org_code=O481&site_code=SS1481&service_code=01
PageCount 13
ParticipantIDs nrf_kci_oai_kci_go_kr_ARTI_10028861
kisti_ndsl_JAKO202221643417548
PublicationCentury 2000
PublicationDate 2022-07
PublicationDateYYYYMMDD 2022-07-01
PublicationDate_xml – month: 07
  year: 2022
  text: 2022-07
PublicationDecade 2020
PublicationTitle 한국건설관리학회 논문집, 23(4)
PublicationTitleAlternate Korean journal of construction engineering and management
PublicationYear 2022
Publisher 한국건설관리학회
Publisher_xml – name: 한국건설관리학회
SSID ssib008451774
ssib036279018
ssib044750969
ssib053377154
Score 1.7986295
Snippet Schedule management is one of pivotal project success factors during construction projects. However, there are many difficulties in rapid scheduling and...
공정관리는 건설 프로젝트에서 가장 중요한 프로젝트 성공 요인 중 하나이다. 그러나, 기존의 공정계획 기법은 건설 프로젝트에서 상당한 수작업과 관리자의 판단이 필요하기 때문에 신속한 공정계획과 운영에 많은 어려움이 있다. 본 연구는 공정계획을 자동화하고 시각화하기 위한 새로운 공정계획...
SourceID nrf
kisti
SourceType Open Website
Open Access Repository
StartPage 65
SubjectTerms 건축공학
Title 건설 공정계획 자동화와 시각화를 위한 가산 그리드 공정계획 기법(CSM)과 CSM기반 소프트로직 알고리즘 개발 연구
URI http://click.ndsl.kr/servlet/LinkingDetailView?cn=JAKO202221643417548&dbt=JAKO&org_code=O481&site_code=SS1481&service_code=01
https://www.kci.go.kr/kciportal/ci/sereArticleSearch/ciSereArtiView.kci?sereArticleSearchBean.artiId=ART002863006
Volume 23
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
ispartofPNX 한국건설관리학회 논문집, 2022, 23(4), 128, pp.65-77
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV1Pa9RAFA-1Jy-iqFj_lIAOKMtKkp0kM-AlyW6plerBCr0tTTYrdWULtb14kFYWD1pRsKutBKmg9dJDdC3uoZ8om_0OvjdJdrMqWsVLdvLmzW_mvZfZeW9I3kjSJcP1WW3BNYvoC2BSbbfIdVMpLixwz2O-oasufu88e9OYvkNn5vX5sfFrubeWVlfcq97DX35X8i9WBRrYFb-S_QvLDkCBAGWwL1zBwnA9lI1JxSK2SmxKKg5hlFi0IEglYutIshTC9ZQC1ZUy4RZh5QLW8QrhCqnYhE0RzkUdJ1wgQYEpgonZhDsCQAGXM8dkE0sntpMgORm4DuVCxq4IAA3KCckkNhMNDWI5WOClAfufB2xha1sM2NaQSWPO7Vmi8ay9U8D7ET4AY4kYBmGOQKMpLLOy0ahCQujaBAkTeXTBLWAtJTdkBwsCUkjInayXVA-m6NhCWdKMlvcyO6XKyWrLP1tOUKhQ26DDpBXP9IDdgL1Q8YLJETKIoXMV5wqmxwCw4eYO1tpJxwBRRqNhfwwoQ5YcEjS2EzMzwmgeBdWjpCwAlLDYLL9ppA1fME6m-f8Se7hYiYy2mLww8SsSGjX0IjeVUm6BNPScq5Ue4DOSBP0H52QkDXrDW6zeXao2lqsQ7F3HdNsaY7j3caSk4ho3-6gyWEsY1dVcaAN-mgmu72CtwTyXEL0PXHmIekxTFYcmDkSBeBWDuEVwO5vL9ZzbOXdcOpbGi7KVTP4T0lhj6aT0Ovr8NW59kKPOfrzTjjqt_tvncvzuZe_Fdn97M95ek-NnQRSuw03v44EcB61-O5CjcC1-HMrRt25vd6_3KhhtHnXD3pf2ZZhEV6LOgQy_SAm35PjJRn-z1X_a7b0P4k_rctzeiDo7ABHvbgFm0AsDOX4TRvt7p6S5qcqcM11MD1gpNuBPGBwhz4N4ra6avlanvlEraS73fcOt-boLGqWequDhZvhyg2e4muuZPlPwdKI6xA2-WzotjTeXmv4ZSa5ziplKS4ZX8yhzDVb3DAg0mI55weueOSFNClVWm7UH96sz1o1b-FRqKsRDFAIYyiaki6BjYeHfWPrsobjOSUeHz_x5aXxledW_AKHDijspnpHvyjnrEg
linkProvider ISSN International Centre
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=%EA%B1%B4%EC%84%A4+%EA%B3%B5%EC%A0%95%EA%B3%84%ED%9A%8D+%EC%9E%90%EB%8F%99%ED%99%94%EC%99%80+%EC%8B%9C%EA%B0%81%ED%99%94%EB%A5%BC+%EC%9C%84%ED%95%9C+%EA%B0%80%EC%82%B0+%EA%B7%B8%EB%A6%AC%EB%93%9C+%EA%B3%B5%EC%A0%95%EA%B3%84%ED%9A%8D+%EA%B8%B0%EB%B2%95%28CSM%29%EA%B3%BC+CSM%EA%B8%B0%EB%B0%98+%EC%86%8C%ED%94%84%ED%8A%B8%EB%A1%9C%EC%A7%81+%EC%95%8C%EA%B3%A0%EB%A6%AC%EC%A6%98+%EA%B0%9C%EB%B0%9C+%EC%97%B0%EA%B5%AC&rft.jtitle=%ED%95%9C%EA%B5%AD%EA%B1%B4%EC%84%A4%EA%B4%80%EB%A6%AC%ED%95%99%ED%9A%8C+%EB%85%BC%EB%AC%B8%EC%A7%91%2C+23%284%29&rft.au=%EC%B5%9C%ED%9D%A5%EC%88%9C&rft.au=%EB%AC%B8%EC%84%B1%ED%98%84&rft.au=%EC%A7%80%EC%84%9D%ED%98%B8&rft.date=2022-07-01&rft.pub=%ED%95%9C%EA%B5%AD%EA%B1%B4%EC%84%A4%EA%B4%80%EB%A6%AC%ED%95%99%ED%9A%8C&rft.issn=2005-6095&rft.eissn=2465-9703&rft.spage=65&rft.epage=77&rft.externalDBID=n%2Fa&rft.externalDocID=oai_kci_go_kr_ARTI_10028861
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=2005-6095&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=2005-6095&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=2005-6095&client=summon