DESIGN AND CONSTRUCTION OF TUNNEL FOR DUST COLLECTOR WITH OVER 250m2 OF CROSS SECTION
This project is to construct a tunnel for dust collector with 252m2 of cross section by using the top heading & bench cutting method. Based on the data by geological pre-investigations using bore-hole-scope. The excavation of dust collector tunnel was completed with the reinforcement of rock-bol...
Saved in:
Published in | PROCEEDINGS OF TUNNEL ENGINEERING, JSCE Vol. 12; pp. 257 - 262 |
---|---|
Main Authors | , , , , |
Format | Journal Article |
Language | English |
Published |
Japan Society of Civil Engineers
18.11.2002
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | This project is to construct a tunnel for dust collector with 252m2 of cross section by using the top heading & bench cutting method. Based on the data by geological pre-investigations using bore-hole-scope. The excavation of dust collector tunnel was completed with the reinforcement of rock-bolts at the cross-part between the dust collector tunnel and another additional tunnel. It was observed that the stable/unstable condition of supports was under the influence of the cracks at the fracture zone. Therefore, the countermeasure against cracks would be effective. |
---|---|
ISSN: | 1884-9091 |
DOI: | 10.11532/journalte1991.12.257 |