Development of “New mucking-out-system” in big and long tunnel

Recently, tunnel construction is in the tendency of the big and long. So far, the method of mucking-out was general to use some dump trucks. This time, we are improved with a pit environment, rapid work, safety and saving labor of the tunnel construction. It developed “New muckong-out-system” which...

Full description

Saved in:
Bibliographic Details
Published inPROCEEDINGS OF TUNNEL ENGINEERING, JSCE Vol. 12; pp. 291 - 296
Main Authors SUZUKI, Hitoshi, TATENUMA, Yoshimasa, KOBAYAKAWA, Tadayuki, WATANABE, Yasushi, EGAMI, Haruhisa
Format Journal Article
LanguageEnglish
Japanese
Published Japan Society of Civil Engineers 2002
公益社団法人 土木学会
Subjects
Online AccessGet full text
ISSN1884-9091
DOI10.11532/journalte1991.12.291

Cover

More Information
Summary:Recently, tunnel construction is in the tendency of the big and long. So far, the method of mucking-out was general to use some dump trucks. This time, we are improved with a pit environment, rapid work, safety and saving labor of the tunnel construction. It developed “New muckong-out-system” which combined carrying out by endless conveyer belt, impact-roll-crasher with the temporary-moment-putting system use to some mucking vessels. This report introduces “New mucking-out-system” adopted in HAKKOUDA TUNNEL between HACHINOHE and SHIN-AOMORI at TOUHOKU SHINKANSEN.
ISSN:1884-9091
DOI:10.11532/journalte1991.12.291