Development of “New mucking-out-system” in big and long tunnel
Recently, tunnel construction is in the tendency of the big and long. So far, the method of mucking-out was general to use some dump trucks. This time, we are improved with a pit environment, rapid work, safety and saving labor of the tunnel construction. It developed “New muckong-out-system” which...
Saved in:
Published in | PROCEEDINGS OF TUNNEL ENGINEERING, JSCE Vol. 12; pp. 291 - 296 |
---|---|
Main Authors | , , , , |
Format | Journal Article |
Language | English Japanese |
Published |
Japan Society of Civil Engineers
2002
公益社団法人 土木学会 |
Subjects | |
Online Access | Get full text |
ISSN | 1884-9091 |
DOI | 10.11532/journalte1991.12.291 |
Cover
Summary: | Recently, tunnel construction is in the tendency of the big and long. So far, the method of mucking-out was general to use some dump trucks. This time, we are improved with a pit environment, rapid work, safety and saving labor of the tunnel construction. It developed “New muckong-out-system” which combined carrying out by endless conveyer belt, impact-roll-crasher with the temporary-moment-putting system use to some mucking vessels. This report introduces “New mucking-out-system” adopted in HAKKOUDA TUNNEL between HACHINOHE and SHIN-AOMORI at TOUHOKU SHINKANSEN. |
---|---|