Trial Construction of Cut-off Wall for le Subsurface Dam Using Trench Cutting Re-mixing Deep Wall (TRD) Method
Saved in:
Published in | Water,Land and Environmental Engineering Vol. 75; no. 10; pp. 930 - 931,a3 |
---|---|
Main Authors | , , , |
Format | Journal Article |
Language | Japanese |
Published |
The Japanese Society of Irrigation Drainage and Rural Engineering
2007
|
Online Access | Get full text |
Cover
Loading…
ISSN: | 1882-2770 1884-7196 |
---|---|
DOI: | 10.11408/jjsidre2007.75.930 |