Operating Experience at Shimane Nuclear Power Plant

Shimane Nuclear Power Plant was built in the period between February, 1970 and March 29, 1974 on which this went into commercial operation. The plant has been maintained smooth operation and has entered the third annual maintenance outage. Maximum exposure of the fuel bundle has reached about 16, 00...

Full description

Saved in:
Bibliographic Details
Published inJournal of the Atomic Energy Society of Japan / Atomic Energy Society of Japan Vol. 19; no. 4; pp. 233 - 236
Main Authors YAKUSHIJI, Kaoru, OKADA, Yoshitane
Format Journal Article
LanguageJapanese
Published Atomic Energy Society of Japan 30.04.1977
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Shimane Nuclear Power Plant was built in the period between February, 1970 and March 29, 1974 on which this went into commercial operation. The plant has been maintained smooth operation and has entered the third annual maintenance outage. Maximum exposure of the fuel bundle has reached about 16, 000 MWD/T. From the fuel bundle inspection and the operating data such as reactor water and off-gas activities, it has been shown that the fuel has been operated soundly. Here are the summary of the plant facility and the operating experience.
ISSN:0004-7120
2186-5256
DOI:10.3327/jaesj.19.233