Research on the time quota of transmission gear based on MOD

Because the motion time of manufacture time quota is difficult to accurately estimate in Chinese Mainland, the calculation for time period and process costs are not accurate in contemporary railway transportation equipments manufacturing industry. On the basis of traditional calculated method of tim...

Full description

Saved in:
Bibliographic Details
Published inThe 2nd International Conference on Information Science and Engineering pp. 3091 - 3094
Main Authors Ma Ziqin, Qi Guangwei, Sun Li, Sun Yongcai, Lu Peng
Format Conference Proceeding
LanguageEnglish
Published IEEE 01.12.2010
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Because the motion time of manufacture time quota is difficult to accurately estimate in Chinese Mainland, the calculation for time period and process costs are not accurate in contemporary railway transportation equipments manufacturing industry. On the basis of traditional calculated method of time quota, this paper formulates motion time quota exploring Modular Arrangement of Predetermined Time Standard of Industrial Engineering, calculates the normal time, considers the time allowance and then determines the standard time of time quota scientifically and reasonably. An example is presented about formulating the time quota of a transmission gear in a locomotive and rolling stock enterprise.
ISBN:142447616X
9781424476169
ISSN:2160-1283
DOI:10.1109/ICISE.2010.5691669