Overcurrent Coordination Study of the Electrical System of PDVSA Sur, Barinas
In this paper part of the results of an overcurrent coordination study for the 34.5/13.8-kV system of PDVSA Sur, operational area of Barinas, Venezuela, are presented. After previous load flow and short-circuit calculations, the protective devices of each distribution circuit were analyzed to choose...
Saved in:
Published in | 2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America pp. 1 - 6 |
---|---|
Main Authors | , , |
Format | Conference Proceeding |
Language | English |
Published |
IEEE
01.08.2006
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | In this paper part of the results of an overcurrent coordination study for the 34.5/13.8-kV system of PDVSA Sur, operational area of Barinas, Venezuela, are presented. After previous load flow and short-circuit calculations, the protective devices of each distribution circuit were analyzed to choose new pickup currents, time-current characteristic (TCC) curves, time dials, and instantaneous settings for the phase-fault and ground-fault protection functions. The new settings improved the times of response of the short-circuit protective devices, the coordination time intervals, and the selectivity and reliability of the system |
---|---|
ISBN: | 9781424402878 1424402875 |
DOI: | 10.1109/TDCLA.2006.311499 |