Overcurrent Coordination Study of the Electrical System of PDVSA Sur, Barinas

In this paper part of the results of an overcurrent coordination study for the 34.5/13.8-kV system of PDVSA Sur, operational area of Barinas, Venezuela, are presented. After previous load flow and short-circuit calculations, the protective devices of each distribution circuit were analyzed to choose...

Full description

Saved in:
Bibliographic Details
Published in2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America pp. 1 - 6
Main Authors Velazco, F.V., Rivas, R.A., Guerrero, N.
Format Conference Proceeding
LanguageEnglish
Published IEEE 01.08.2006
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:In this paper part of the results of an overcurrent coordination study for the 34.5/13.8-kV system of PDVSA Sur, operational area of Barinas, Venezuela, are presented. After previous load flow and short-circuit calculations, the protective devices of each distribution circuit were analyzed to choose new pickup currents, time-current characteristic (TCC) curves, time dials, and instantaneous settings for the phase-fault and ground-fault protection functions. The new settings improved the times of response of the short-circuit protective devices, the coordination time intervals, and the selectivity and reliability of the system
ISBN:9781424402878
1424402875
DOI:10.1109/TDCLA.2006.311499