Low voltage ride through performance of a 4MVA synchronous generator - measurements and simulations

Complying with grid code requirements for low voltage ride through is a challenge for generator sets (GenSets). The generator experiences a short circuit at the beginning of the fault and then goes through severe recovery processes. It is shown that in some cases grid voltage recovery induces 25% hi...

Full description

Saved in:
Bibliographic Details
Published in7th IET International Conference on Power Electronics, Machines and Drives (PEMD 2014) p. 0497
Main Authors Narayanan, S, Mebarki, A, Brown, N.L
Format Conference Proceeding
LanguageEnglish
Published Stevenage, UK IET 2014
The Institution of Engineering & Technology
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Complying with grid code requirements for low voltage ride through is a challenge for generator sets (GenSets). The generator experiences a short circuit at the beginning of the fault and then goes through severe recovery processes. It is shown that in some cases grid voltage recovery induces 25% higher peak current that the short circuit peak current for a 4MVA 1500rpm synchronous generator. Short circuit decrement tests are used to calibrate the Matlab model parameters and then extensive numbers of simulations are carried out to show the impact of LVRT on a large synchronous generator.
ISBN:1849198152