Unstrained Installation of Hangers and Optimal Calculation of Self-Anchored Suspension Bridge
Sanchaji Bridge over Xiangjiang River, located in Changsha, Hunan Province, China, is a self-anchored suspension bridge. The hangers of Sanchaji Bridge are installed in an unstrained state that is quite different from the traditional construction method. With the tension-compression and bending stra...
Saved in:
Published in | Engineering Computation Proceedings pp. 3 - 7 |
---|---|
Main Authors | , |
Format | Conference Proceeding |
Language | English |
Published |
IEEE
01.05.2009
|
Subjects | |
Online Access | Get full text |
ISBN | 9780769536552 0769536557 |
DOI | 10.1109/ICEC.2009.38 |
Cover
Summary: | Sanchaji Bridge over Xiangjiang River, located in Changsha, Hunan Province, China, is a self-anchored suspension bridge. The hangers of Sanchaji Bridge are installed in an unstrained state that is quite different from the traditional construction method. With the tension-compression and bending strain energy of stiffening girder and pylons as the objective function, the mechanical state of self-anchored suspension bridge are calculated with the optimization method. A model test with the scale 1:28 is carried out to validate the process of construction and calculation method. The calculation is basically consistent with the experimental data. The cable force, main girder stress and bearing reaction are changed gently during the construction and the structure transformation process is completed successfully. The results indicate that optimization theory can be used effectively in self-anchored suspension bridge calculation. The unstrained installing of hangers meets the requirement of mechanics during the construction, and the work efficiency is improved. |
---|---|
ISBN: | 9780769536552 0769536557 |
DOI: | 10.1109/ICEC.2009.38 |