Crosstalk research of long strip timing RPC

The time-of-flight (TOF) wall of CBM is proposed to be assembled with MRPCs. In a relative high particle multiplicity situation (about 20kHz/cm 2 ), multi-hit capability is one of the most demanding requirement of the detector. Crosstalk is an important reason for the deterioration the multi-hit cap...

Full description

Saved in:
Bibliographic Details
Published inIEEE Nuclear Science Symposuim & Medical Imaging Conference pp. 795 - 798
Main Authors Yi Wang, Jingbo Wang, Weicheng Ding, Huangshan Chen, Yuanjing Li, Jianping Cheng
Format Conference Proceeding
LanguageEnglish
Published IEEE 01.10.2010
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The time-of-flight (TOF) wall of CBM is proposed to be assembled with MRPCs. In a relative high particle multiplicity situation (about 20kHz/cm 2 ), multi-hit capability is one of the most demanding requirement of the detector. Crosstalk is an important reason for the deterioration the multi-hit capability of a detector. To reduce the crosstalk level, a kind of shielded long-strip two-end readout MRPC was developed. 1mm width guard strips were added between strips of a 1m-long MRPC. Beam test with 2.5GeV protons was performed in GSI in August, 2009. Horizontal and vertical scans were done. Combined with data from silicon detector, we get the crosstalk between four neighbor strips. The results show that the crosstalk level can be reduced and double hits can affect the time resolution. It also shows that the crosstalk increase with high voltage and decrease with surface resistivity of electrode.
ISBN:9781424491063
1424491061
ISSN:1082-3654
2577-0829
DOI:10.1109/NSSMIC.2010.5873868