Minimizing total weighted completion time on a batch-processing machine with re-entrance

The single batch-processing machine scheduling problem with re-entrance to minimize total weighted completion time is considered, where the capacity of the machine is infinite and there are different processing types in the same machine. This problem can be transformed into a model with parallel cha...

Full description

Saved in:
Bibliographic Details
Published in2009 IEEE International Conference on Automation and Logistics pp. 1791 - 1794
Main Authors Rui Zheng, Hongyu Li
Format Conference Proceeding
LanguageEnglish
Published IEEE 01.08.2009
Subjects
Online AccessGet full text
ISBN9781424447947
1424447941
ISSN2161-8151
DOI10.1109/ICAL.2009.5262674

Cover

Loading…
More Information
Summary:The single batch-processing machine scheduling problem with re-entrance to minimize total weighted completion time is considered, where the capacity of the machine is infinite and there are different processing types in the same machine. This problem can be transformed into a model with parallel chains precedence constraint. A polynomial time heuristic algorithm for the problem is given. Experimentation results show that the algorithm is efficient.
ISBN:9781424447947
1424447941
ISSN:2161-8151
DOI:10.1109/ICAL.2009.5262674