Optimal response of a hydroelectric power plant with bilateral contracts
Deregulation and liberalization of electric power industry, among other things, has created new requirements for the market participants. The power system engineer, operator, and, in general, the market participant is being faced with requirements for which he does not have adequate training and the...
Saved in:
Published in | Melecon 2010 - 2010 15th IEEE Mediterranean Electrotechnical Conference pp. 237 - 242 |
---|---|
Main Authors | , , |
Format | Conference Proceeding |
Language | English |
Published |
IEEE
01.04.2010
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | Deregulation and liberalization of electric power industry, among other things, has created new requirements for the market participants. The power system engineer, operator, and, in general, the market participant is being faced with requirements for which he does not have adequate training and the proper software tools. In this framework, among others, a pure hydro-generation company has to operate its hydro units, throughout the operating day, trying to fulfill the market clearing schedule or a bilateral contract. This paper addresses the optimal response of a hydroelectric power plant with bilateral contracts in order to maximize its profit from selling energy. |
---|---|
ISBN: | 9781424457939 1424457939 |
ISSN: | 2158-8473 2158-8481 |
DOI: | 10.1109/MELCON.2010.5476297 |