Bicriteria parallel machines scheduling problem with fuzzy due dates based on NPGA
A kind of unrelated parallel machines scheduling problem with fuzzy due dates was discussed. The memberships of fuzzy due dates denoted the grades of satisfaction of decision-maker with respect to completion times with jobs. Objectives of scheduling is to maximize the minimum grade of satisfaction w...
Saved in:
Published in | 2009 International Conference on Machine Learning and Cybernetics Vol. 1; pp. 597 - 601 |
---|---|
Main Authors | , |
Format | Conference Proceeding |
Language | English |
Published |
IEEE
01.07.2009
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | A kind of unrelated parallel machines scheduling problem with fuzzy due dates was discussed. The memberships of fuzzy due dates denoted the grades of satisfaction of decision-maker with respect to completion times with jobs. Objectives of scheduling is to maximize the minimum grade of satisfaction while makespan is minimized in the meantime. Niched Pareto genetic algorithm (NPGA) was employed to search the Pareto optimal solution sets for above bicriteria scheduling problem. Numerical simulation illustrates that ability of NPGA to find and maintain Pareto optimal solutions set in population. |
---|---|
ISBN: | 9781424437023 1424437024 |
ISSN: | 2160-133X |
DOI: | 10.1109/ICMLC.2009.5212516 |