Real-time Allocation of Multi-Type Production Resource with Due Date grouping for MTO Manufacturing
The simultaneous n-type resource allocation method SRAR 2 was improved both in the computational time and the optimization levels in this study. The computational time becomes less than 1 second for the actual resource allocation problem of three types of resource and of 2 months demands (# decision...
Saved in:
Published in | 2018 International Symposium on Semiconductor Manufacturing (ISSM) pp. 1 - 4 |
---|---|
Main Authors | , |
Format | Conference Proceeding |
Language | English |
Published |
IEEE
01.12.2018
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The simultaneous n-type resource allocation method SRAR 2 was improved both in the computational time and the optimization levels in this study. The computational time becomes less than 1 second for the actual resource allocation problem of three types of resource and of 2 months demands (# decision variables:157440, wafer test process). SRAR 2 and due-date oriented dispatching such as EDD (Earliest Due-date first) achieved the best performance as the result of supplemental effects. |
---|---|
DOI: | 10.1109/ISSM.2018.8651129 |