Calculation Method for Incremental 'Coal to Electricity' Load and Corresponding Average Distribution Transformer Capacity

Distribution network planning is the basis to guarantee reliable operation of 'Coal to Electricity' ('C2E') distribution network. While, as a kind of incremental load, there is no standard about transformer capacity for each 'C2E' consumer. As a result, 'C2E'...

Full description

Saved in:
Bibliographic Details
Published in2019 IEEE 3rd International Electrical and Energy Conference (CIEEC) pp. 879 - 885
Main Authors Sun, Qinfei, Chen, Ping, Yang, Shuo, Gong, Cheng, Liang, Anqi, Wang, Zhao, Li, Xianglong
Format Conference Proceeding
LanguageEnglish
Published IEEE 01.09.2019
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Distribution network planning is the basis to guarantee reliable operation of 'Coal to Electricity' ('C2E') distribution network. While, as a kind of incremental load, there is no standard about transformer capacity for each 'C2E' consumer. As a result, 'C2E' distribution network planning and design lacks basic rules. Aimed at this problem, a method named 'Heat load to Electricity load' for calculating 'C2E' incremental load and average transformer capacity per consumer is proposed in this paper, which provides basis to 'C2E' distribution network and electrical equipment selection. With this method, 'C2E' electrical load and average transformer capacity is determined by heating load of building in demand side. An example with typical residential building in Beijing is taken in this paper. Heating load of building is calculated using DeST (Designer's Simulation Toolkits) firstly. Then, with the kind of electrical heating equipment, average transformer capacity for each 'C2E' consumer in Beijing rural area is given.
DOI:10.1109/CIEEC47146.2019.CIEEC-2019340