Feasibility study of novel rapid ramp-down procedure in MgB 2 MRI magnet using persistent current switch with high off-resistivity

Abstract Dry magnets using high temperature superconductors and MgB 2 are attractive options to depart from dependence on liquid helium in MRI scanners. In the dry magnets, however, lack of thermal mass of cryogen makes a controlled quench difficult and extends time for restarting the magnets after...

Full description

Saved in:
Bibliographic Details
Published inSuperconductor science & technology Vol. 34; no. 7; p. 74003
Main Authors Kodama, Motomune, Kotaki, Hiroshi, Ohara, Shinya, Ichiki, Yota, Fujita, Shinji, Suzuki, Takaaki, Tanaka, Hideki, Aoki, Manabu
Format Journal Article
LanguageEnglish
Published 01.07.2021
Online AccessGet full text

Cover

Loading…
More Information
Summary:Abstract Dry magnets using high temperature superconductors and MgB 2 are attractive options to depart from dependence on liquid helium in MRI scanners. In the dry magnets, however, lack of thermal mass of cryogen makes a controlled quench difficult and extends time for restarting the magnets after the quench. In this study, a novel rapid ramp-down procedure, which can be substituted for the controlled quench in emergency rundown, is proposed, and its feasibility is proven for a 1.5 T whole-body MgB 2 MRI magnet. In this procedure, a power supply receives current from a persistent current switch (PCS), the PCS is turned off by heating, the power supply is interrupted by a breaker, and the stored energy in the magnet is mostly consumed at an external resistor. Owing to the large energy margin of MgB 2 wires, the AC loss during the ramp-down does not bring a quench of the MgB 2 coils. A niobium–titanium sheathed MgB 2 wire 0.60 mm in diameter is made, and a PCS with high off-resistivity is designed using this wire. The shunt current during the ramp-down does not bring the burnout of the PCS when the wire length is sufficiently long, typically hundreds of metres. Because heat generation inside the cryostat during the ramp-down is a few per cent of the stored energy in the magnet, the magnet is not heated excessively. As a result, the proposed ramp-down procedure should shorten the downtime of MRI scanners.
ISSN:0953-2048
1361-6668
DOI:10.1088/1361-6668/ac034f