100 ns current rise time LTD stage

LTD stages are designed to be used as a primary energy storage in high power pulsed generators. Previously the LTD stages with the current rise time of 1000 ns and 450 ns were reported. Present report describes the design and test results of the LTD stage that provides /spl sim/200 kA rising in 100...

Full description

Saved in:
Bibliographic Details
Published inPPPS-2001 Pulsed Power Plasma Science 2001. 28th IEEE International Conference on Plasma Science and 13th IEEE International Pulsed Power Conference. Digest of Papers (Cat. No.01CH37251) Vol. 2; pp. 1491 - 1494 vol.2
Main Authors Kim, A.A., Kovalchuk, B.M., Bastrikov, A.N., Durakov, V.G., Volkov, S.N., Sinebryukhov, V.A.
Format Conference Proceeding
LanguageEnglish
Published IEEE 2001
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:LTD stages are designed to be used as a primary energy storage in high power pulsed generators. Previously the LTD stages with the current rise time of 1000 ns and 450 ns were reported. Present report describes the design and test results of the LTD stage that provides /spl sim/200 kA rising in 100 ns in the matched /spl sim/0.4 Ohm load.
ISBN:0780371208
9780780371200
DOI:10.1109/PPPS.2001.1001840