Experimental investigation of heuristics for resource-constrained project scheduling: An update
This paper considers heuristics for the well-known resource-constrained project scheduling problem (RCPSP). It provides an update of our survey which was published in 2000. We summarize and categorize a large number of heuristics that have recently been proposed in the literature. Most of these heur...
Saved in:
Published in | European journal of operational research Vol. 174; no. 1; pp. 23 - 37 |
---|---|
Main Authors | , |
Format | Journal Article |
Language | English |
Published |
Amsterdam
Elsevier B.V
01.10.2006
Elsevier Elsevier Sequoia S.A |
Series | European Journal of Operational Research |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | This paper considers heuristics for the well-known resource-constrained project scheduling problem (RCPSP). It provides an update of our survey which was published in 2000. We summarize and categorize a large number of heuristics that have recently been proposed in the literature. Most of these heuristics are then evaluated in a computational study and compared on the basis of our standardized experimental design. Based on the computational results we discuss features of good heuristics. The paper closes with some remarks on our test design and a summary of the recent developments in research on heuristics for the RCPSP. |
---|---|
ISSN: | 0377-2217 1872-6860 |
DOI: | 10.1016/j.ejor.2005.01.065 |