Determination of storage tanks location for optimal short-term scheduling in multipurpose/multiproduct batch-continuous plants under uncertainties

A multipurpose/multiproduct plant has to deal with many combinations of tasks sequences and operation rates that lead to accumulation problems. These problems can be handled using storage tanks, but usually their location within the flowsheet is predetermined and not subject to optimization, missing...

Full description

Saved in:
Bibliographic Details
Published inAnnals of operations research Vol. 199; no. 1; pp. 225 - 247
Main Authors Durand, Guillermo A., Mele, Fernando D., Bandoni, J. Alberto
Format Journal Article
LanguageEnglish
Published Boston Springer US 01.10.2012
Springer
Springer Nature B.V
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:A multipurpose/multiproduct plant has to deal with many combinations of tasks sequences and operation rates that lead to accumulation problems. These problems can be handled using storage tanks, but usually their location within the flowsheet is predetermined and not subject to optimization, missing the opportunity to better satisfy the customers. In this work we will determinate the optimal location of storage tanks for the short-term scheduling under uncertainty. A hybrid simulation-based optimization (SBO) strategy was developed and implemented to solve the problems combining stochastic and deterministic solution algorithms.
Bibliography:ObjectType-Article-2
SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 23
ISSN:0254-5330
1572-9338
DOI:10.1007/s10479-011-0970-8