Multidisciplinary geophysical measurements on the ocean floor using decommissioned submarine cables: VENUS project

To perform geophysical and multidisciplinary real-time measurements on the ocean floor, it has been attempted to reuse decommissioned submarine cables. The VENUS project reuses the TPC-2, which is one of these systems and runs across the entire Philippine Sea Plate between Guam Island and Okinawa Is...

Full description

Saved in:
Bibliographic Details
Published inIEEE journal of oceanic engineering Vol. 25; no. 1; pp. 111 - 120
Main Authors Kasahara, J., Shirasaki, Y., Momma, H.
Format Journal Article Conference Proceeding
LanguageEnglish
Published New York, NY IEEE 01.01.2000
Institute of Electrical and Electronics Engineers
The Institute of Electrical and Electronics Engineers, Inc. (IEEE)
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:To perform geophysical and multidisciplinary real-time measurements on the ocean floor, it has been attempted to reuse decommissioned submarine cables. The VENUS project reuses the TPC-2, which is one of these systems and runs across the entire Philippine Sea Plate between Guam Island and Okinawa Island. The VENUS system comprises an ocean floor observatory, a submarine cable, and a land system. The major components of the ocean floor observatory are geophysical instruments and a telemetry system. There are seven scientific instrument units including broadband seismometers and a hydrophone array. Digital telemetry using the old analog telephone cable obtains high data accuracy and real-time accessibility to data from a laboratory on land. The bottom-telemetry system and a part of sensor units were installed at a depth of 2157 m on the landward slope of the Ryukyu (Nansei-Syoto) Trench on August 29, 1999. The data from the hydrophone array and tsunami gauge have been correctly transmitted to the data center. The rest of the scientific instruments will be deployed by deep-tow equipment and a remotely operated vehicle. Using a decommissioned submarine cable will greatly reduce construction costs compared to using a new cable system.
Bibliography:ObjectType-Article-2
SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 23
ObjectType-Article-1
ObjectType-Feature-2
ISSN:0364-9059
1558-1691
DOI:10.1109/48.820743