A maximum flow formulation of a multi-period open-pit mining problem
We consider the problem of finding an optimal mining sequence for an open pit during a number of time periods subject to only spatial and temporal precedence constraints. This problem is of interest because such constraints are generic to any open-pit scheduling problem and, in particular, because i...
Saved in:
Published in | Operational research Vol. 14; no. 1; pp. 1 - 10 |
---|---|
Main Authors | , , |
Format | Journal Article |
Language | English |
Published |
Berlin/Heidelberg
Springer Berlin Heidelberg
01.04.2014
Springer Nature B.V |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | We consider the problem of finding an optimal mining sequence for an open pit during a number of time periods subject to only spatial and temporal precedence constraints. This problem is of interest because such constraints are generic to any open-pit scheduling problem and, in particular, because it arises as a Lagrangean relaxation of an open-pit scheduling problem. We show that this multi-period open-pit mining problem can be solved as a maximum flow problem in a time-expanded mine graph. Further, the minimum cut in this graph will define an optimal sequence of pits. This result extends a well-known result of J.-C. Picard from 1976 for the open-pit mine design problem, that is, the single-period case, to the case of multiple time periods. |
---|---|
Bibliography: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 ObjectType-Article-2 content type line 23 |
ISSN: | 1109-2858 1866-1505 1866-1505 |
DOI: | 10.1007/s12351-013-0140-7 |