Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs
This research investigates the problem of scheduling jobs on a set of parallel machines where the speed of the machines depends on the allocation of a secondary resource. The secondary resource is fixed in quantity and is to be allocated to the machines at the start of the schedule. The scheduling o...
Saved in:
Published in | European journal of operational research Vol. 179; no. 2; pp. 302 - 315 |
---|---|
Main Authors | , , |
Format | Journal Article |
Language | English |
Published |
Amsterdam
Elsevier B.V
01.06.2007
Elsevier Elsevier Sequoia S.A |
Series | European Journal of Operational Research |
Subjects | |
Online Access | Get full text |
ISSN | 0377-2217 1872-6860 |
DOI | 10.1016/j.ejor.2006.03.028 |
Cover
Summary: | This research investigates the problem of scheduling jobs on a set of parallel machines where the speed of the machines depends on the allocation of a secondary resource. The secondary resource is fixed in quantity and is to be allocated to the machines at the start of the schedule. The scheduling objective is to minimize the number of tardy jobs. Two versions of the problem are analyzed. The first version assumes that the jobs are pre-assigned to the machines, while the second one takes into consideration the task of assigning jobs to the machines. The paper proposes an Integer Programming formulation to solve the first case and a set of heuristics for the second. |
---|---|
Bibliography: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 |
ISSN: | 0377-2217 1872-6860 |
DOI: | 10.1016/j.ejor.2006.03.028 |