A Lot-Sizing Algorithm for Reducing Nervousness in MRP Systems
Previous work dealt with the problems of nervousness in Material Requirements Planning (MRP) Systems when production schedules were modified to include setups which previously had not been scheduled. In this work we further examine nervousness and its cost. By modifying the setup costs used in the W...
Saved in:
Published in | Management science Vol. 30; no. 2; pp. 240 - 244 |
---|---|
Main Authors | , |
Format | Journal Article |
Language | English |
Published |
Linthicum
INFORMS
01.02.1984
Institute of Management Sciences Institute for Operations Research and the Management Sciences |
Series | Management Science |
Subjects | |
Online Access | Get full text |
ISSN | 0025-1909 1526-5501 |
DOI | 10.1287/mnsc.30.2.240 |
Cover
Loading…
Summary: | Previous work dealt with the problems of nervousness in Material Requirements Planning (MRP) Systems when production schedules were modified to include setups which previously had not been scheduled. In this work we further examine nervousness and its cost. By modifying the setup costs used in the Wagner-Whitin algorithm, we develop a generalized solution methodology for dealing with situations in which new setups are added to the production schedule and existing setups are cancelled. |
---|---|
Bibliography: | ObjectType-Article-2 SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 ObjectType-Article-1 |
ISSN: | 0025-1909 1526-5501 |
DOI: | 10.1287/mnsc.30.2.240 |